What is powered land, and why is it worth more?

Powered land is land that already has a grid connection, or a secured right to one, big enough for a data center.

By Razvan Toma · Founder & CEO, Ampervia · Last checked 2026-10-12 · Sources linked below

Quick answer

Powered land is land that already has a grid connection, or a secured right to one, big enough for a data center. Because grid capacity, not land, is the scarce input, it is priced per megawatt: JLL puts prime powered land in Europe’s core hubs at about €2.26 million per MW in 2026, up 82% from €1.24 million in 2021.

Key facts

  • Prime powered land in FLAP-D hubs: about €2.26 million per MW in 2026, up from €1.24 million in 2021 (+82%) — JLL.
  • Reported averages outside the core: about €978,000 per MW in secondary markets and €512,000 per MW in tertiary markets — Noah Intelligence, citing the same price series.
  • BSIC puts core markets at €800,000–€1.4 million per MW and sites where power arrives late at €200,000–€700,000 per MW.
  • A completed Madrid sale: 17,650 m² in Meco with a 25 MW power agreement sold to Pure DC for €11 million (about €440,000 per MW) — ActivumSG.
Reported powered-land prices in Europe, per MW
Market tierPrice per MWSource
Prime FLAP-D hubs (2026)€2.26 millionJLL
Prime FLAP-D hubs (2021)€1.24 millionJLL
Secondary markets€978,000Noah Intelligence
Tertiary markets€512,000Noah Intelligence
Core markets (range)€0.8–1.4 millionBSIC
Late-arriving power (range)€0.2–0.7 millionBSIC
Meco, Madrid, 25 MW (completed sale, 2024)≈€440,000ActivumSG

Levels of power readiness

  • Near a substation: no right to capacity yet. Not powered land.
  • Capacity published at the node: a request can be filed, but nothing is reserved.
  • Access permit or connection offer: capacity reserved for the site. This is what buyers pay for.
  • Energised connection: power can be drawn now.

Why it is priced per MW

A data center’s revenue scales with the IT megawatts it can run, and grid queues in core markets run for years. A buyer therefore compares sites by what each megawatt of secured capacity costs, not by area.

Watch-outs

  • Ask for the permit or connection offer, not a description of nearby infrastructure.
  • Check whether the right can transfer to a new owner and a new activity. In Spain it may not: see RDL 7/2026.
  • Grid MW and IT MW differ. Check which one a price refers to.

Questions

Is land near a substation powered land?
No. Without a permit or connection offer, the land has no right to capacity. It is a candidate, priced as industrial land.
Can powered land lose its power?
Yes. Permits can lapse if milestones are missed, and in Spain a demand permit lapses if the connected site does not keep its declared activity for three years.

Sources

Terms on this page: Powered land · Access and connection permit · Connection offer · FLAP-D · IT load