What Ampervia does
Ampervia finds sites where land and grid capacity line up, secures them with its members through one vehicle per site, takes them to ready-to-build, and brings in institutional partners at site control, during development or at ready-to-build, depending on the deal. Its public research product is the Ampervia Powered-Land Map; the answers, rules tracker and datasets on this site publish the research behind it.
Razvan Toma, founder and CEO
Razvan Toma is a civil engineer with an LL.M. in business law and an MBA. He has founded and run companies since 2002, each one closer to the work Ampervia does now: building, then infrastructure for cities, then infrastructure for AI.
- 2002–2009: Bauten Group. He started this civil engineering company as a student and ran it for seven years, employing tens of people and working with municipalities, contractors and service providers.
- From 2009: Smartup Cities. He founded Smartup Cities to provide circular-economy and smart city solutions to businesses and municipalities. It worked with cities and large companies in France, Germany, Spain, Italy and the United States, in partnership with AT&T in the US and with large telecom providers in Europe. That work was his first contact with the connected infrastructure that AI now runs on.
- From 2024: AI infrastructure. He founded an AI infrastructure company that rents GPUs and provides inference services to AI companies.
- Education. Dipl.-Ing. in civil, industrial and agricultural engineering (2002–2007); LL.M. in business law and MBA in entrepreneurship and innovation management (2010).
- Network. Institutional investors, C-level executives of large companies, senior European politicians and city managers. Member of a Smart Cities think tank in the Valencia region since 2016.
- Languages. Works in English, German, Spanish, French and Romanian.
A data center site needs all three backgrounds: reading land and construction, working with municipalities and utilities, and knowing what AI operators need from a site.
At Ampervia he leads site origination and research: reading grid capacity node by node, the rules that govern connections in each country, and the economics of taking a site from land to ready-to-build. For each site he engages local specialists: grid-connection engineers, land and planning lawyers, permitting consultants and surveyors. He is available to journalists and conference organisers on these topics:
- Powered land
- Data center grid access in Spain and Italy
- Ready-to-build data center sites
- Data center site origination
- European data center investment
Follow or contact him on LinkedIn, or write to team@ampervia.com.
How we source
- Every figure links to its source, with the date we last checked it.
- Our own datasets, such as Spain grid capacity by province, are built from official publications and refreshed monthly.
- We publish aggregates only and never identify a candidate site, its owner or its municipality. Site-level research is for Club members.
- Nothing here is investment advice or an offer of any security.
