Kelsterbach, Frankfurt: an older data center bought for €81.8 million, sold for €50 million

When the exit goes the other way.

By Razvan Toma · Founder & CEO, Ampervia · Last checked 2026-10-13 · Sources linked below

Quick answer

Keppel DC REIT bought the Kelsterbach data center near Frankfurt Airport in 2019 for €81.8 million; built in 1989 as a shell-and-core facility with a lease ending in 2025, it was sold in 2025 for €50 million. Being in Frankfurt did not protect an old building with an expiring lease. DCD

Timeline

WhenWhat happened
1989Five-storey shell-and-core data center built (former Lufthansa/IBM IT site). DCD
2019Keppel DC REIT buys it for €81.8m. DCD
2025Sold for €50m, all cash, as the lease neared expiry. DCD

What changed between entry and exit

Not applicable: this case shows value falling.

Capital and counterparties

Keppel DC REIT (listed); buyer unnamed.

Economics: confirmed and not disclosed

ItemFigureNote
Entry price (2019)€81.8 million DCD
Exit price (2025)€50 million DCD
Change≈−39%Ampervia calculation, before income received

Risks and limitations

  • The sale came as the lease neared its end; the source does not give the seller’s reasons.
  • Built in 1989: specification relative to modern requirements is not described in the source.

Relevance to Ampervia

A Frankfurt address did not protect an older building with a lease ending: value comes from power, permits and a tenant-ready specification, not the postcode alone. Every Ampervia site is screened with that in mind.

Sources

DCD

Last checked 2026-10-13. Third-party precedent, not an Ampervia project.