By Razvan Toma · Founder & CEO, Ampervia · Last checked 2026-10-12 · Sources linked below
As of 2026-10-12, Ampervia’s pipeline holds 60 candidates across 6 European countries (16 Tier-A), each checked against public records and screened against written buyer requirements. All are at the research stage: no owner agreement, grid confirmation or site control is claimed. This page is updated as sites move to option, grid request, connection offer and ready-to-build. The Ampervia Powered-Land Ma
Sites by stage
| Stage | Sites | What it means |
|---|---|---|
| Research candidate | 60 | Site, industrial grid history and market status checked against public records. |
| Of which Tier-A | 16 | Strongest public-record evidence in our screening. Not a statement about site control or confirmed power. |
The stages ahead
- Land under option. Exclusive right to buy signed by a site vehicle.
- Grid request filed. Access and connection request filed for a data center.
- Connection offer received. Operator’s offer naming capacity, works and date.
- Ready-to-build. Land, connection offer and permits in place.
By country
| Country | Candidates | Tier-A |
|---|---|---|
| Spain | 25 | 4 |
| Italy | 16 | 3 |
| Germany | 10 | 4 |
| France | 7 | 5 |
| United Kingdom | 1 | 0 |
| Ireland | 1 | 0 |
Early leads, counted separately
The 60 candidates above are the only sites in the pipeline count. Counted apart from them, the Ampervia Powered-Land Map also shows 8 early leads in Europe and 18 early leads in the United States. Early leads have not been checked to the candidate standard, and no US lead has been confirmed by a utility.
What members see
Members see each site identified, with its dossier and stage, in the monthly pipeline report. Public pages show counts only and never identify a site, owner or municipality.