By Razvan Toma · Founder & CEO, Ampervia · Last checked 2026-10-12 · Sources linked below
They sit at four stages, each with different risk: land and power (securing a site and grid capacity), ready-to-build sites sold to operators, construction funded by institutions and banks, and operating data centers that earn rent. The scarce input is grid power: prime powered land reached about €2.26 million per MW in core hubs in 2026, and the most value per euro is created before anything is built. Sources (4)JLLJLL — EMEA data centre report↗
YeandelYeandel — Spain granted twelve, planned four↗
Key4bizKey4biz — la Lombardia chiede alla rete 44,96 GW↗DataTechDataTech — EdgeMode agrees €300m non-binding sale of Spain project↗
Key facts
- Prime powered land in FLAP-D hubs: about €2.26 million per MW in 2026, up 82% since 2021 (JLL).
- Spain has granted about 12 GW of grid access to data centers against a 2030 demand forecast of 3.5–4 GW (Yeandel, citing official figures): access is plentiful on paper, scarce where buyers want it.
- Lombardy alone has 44.96 GW of data center connection requests, against Italian peak demand of about 58 GW (Key4biz).
- Ready-to-build capacity is now priced explicitly: one non-binding Spanish offer values a 300 MW project at €1 million per MW of RTB IT capacity (DataTech).
| Stage | What the investor funds | Main risk | How value is realised |
|---|---|---|---|
| Land and power | Option or purchase, grid request, studies | Grid answer and permits | Sale at RTB, or roll into the build |
| Ready-to-build | Purchase of a permitted, powered site | Construction and leasing | Build and lease, or resell |
| Construction | Equity and debt for the building | Cost, delay, tenant | Stabilised asset |
| Operating | Buying or holding a leased data center | Tenant renewal, technology | Rent and resale |
Who can take part
Operating assets and construction are mostly funded by infrastructure funds, insurers and banks with large tickets. The land-and-power stage needs far less capital per site, which is why club deals and single-site vehicles are used there. Eligibility depends on where the investor lives and how the deal is offered.
How Ampervia participates
Ampervia works at the land-and-power stage: it finds sites, secures them through one vehicle per site with its Club members, and takes them to ready-to-build before institutions fund the build. See the Ampervia Club. This page is general information, not an offer.
Questions
Which stage has the highest risk?
Are returns guaranteed at any stage?
Sources
- JLL — EMEA data centre report
- Yeandel — Spain granted twelve, planned four
- Key4biz — la Lombardia chiede alla rete 44,96 GW
- DataTech — EdgeMode agrees €300m non-binding sale of Spain project
Terms on this page: Powered land · Ready-to-build (RTB) · SPV · Club deal
Ampervia Capital