# Sample member dossier (illustrative)

> Built from a real site with identity and figures redacted. No return or valuation is shown.

Site DE-05 · Dresden zone · 15–40 MW-class · Administrator sale · Ampervia Score 83/100

- Power headroom: 85/100
- Permit climate: 78/100
- Process clarity: 88/100
- Verification: 78/100

## 1. Site summary

Former industrial site in a court-run administration, offered through the administrator. **[Identity, address and parcel references released to members.]**

## 2. Grid evidence

- Historical connection and consumption profile of the former plant. **[Figures released to members.]**
- Nearest substations and published capacity at the relevant nodes.
- What the operator must still confirm, and the expected route to a connection offer.

## 3. Land and title

- Owner, administrator and sale process, with deadlines.
- Registry extract: charges, easements, existing leases.
- Contamination and demolition status.

## 4. Permit path

- Zoning and the steps to permit a data center on this land.
- Regional permit climate (scored 78/100 from planning evidence).
- Rules that apply, with links to the [rules tracker](https://ampervia.com/rules/).

## 5. Cost-to-ready-to-build items

- Option or purchase structure and timing.
- Grid studies, connection fees and guarantees.
- Planning, legal and specialist costs. **[Estimates released to members.]**

## 6. Risks

- Grid: whether the operator grants the needed capacity, and when.
- Process: administrator timetable and competing bidders.
- Planning: local acceptance of a data center use.

## 7. Next decision

Whether to form a vehicle and secure the site, the capital needed for that step, and the deadline. Members decide individually whether to join.