# Access data center opportunities at the land and power stage. > The Ampervia Club is a €25,000-a-year membership for investors with at least €1 million in investable capital, or access to it. Members get access to the off-market data center site opportunities Ampervia assembles, including a live site review every week, and to the network behind them: local experts in each market and the operators and funds that buy ready sites. Each site vehicle is offered to members before outside investors. Co-investing is optional, and membership is not an investment. **The aim: own part of a data center site while it is still land and a power request, and take part when an operator or fund buys it or partners on it.** Membership gives you the access: every week a site is reviewed live with members, and you see it, examine the evidence and decide. Ownership comes only through a separate, optional site vehicle. You don’t build the operation or fund the data center yourself. ## The picture - **≈€1.5–3.5m** — comparable industrial land around a plot near Madrid (Ampervia estimate) - **25 MW** — power agreement secured on the plot - **€11m** — what an operator paid for the powered site Meco, Madrid: a published third-party deal, not an Ampervia result, and not a forecast of any member’s return. The operator then approved a €400m first-phase build with its own capital. €25,000 a year for membership; project investment is separate and optional. ## From the founder The value in a data center is set long before construction starts: when someone ties up the right land and proves the power can get there. By the time an operator announces a campus, that step has been taken and priced. I built Ampervia to work at that step, wherever the buyers are, with local specialists in each market, and to open it to private investors. You see each site as it comes through, with the evidence, and choose for yourself which ones to back. My background is the three things a site needs. I am a civil engineer with an LL.M. in business law and an MBA. I ran Bauten Group, a civil engineering company, from 2002 to 2009, then founded Smartup Cities, working with municipalities and large companies in France, Germany, Spain, Italy and the United States, and in 2024 an AI infrastructure company renting GPUs and providing inference. If that is where you want to be, apply below. If you qualify, I’ll walk you through a real dossier on a private call. ## Capital is abundant. Powered sites are not. - **$720–745bn** — 2026 capex guidance of the four largest hyperscalers - **Up to $3tn** — data center investment needed worldwide by 2030 - **$562bn** — development capital needed for the EMEA pipeline - **$26bn** — raised by digital infrastructure funds in 2025, a record Grid rules are moving to “first ready, first served”: Germany’s transmission operators since April 2026, the UK through Gate 2, and Spain auctions capacity at congested nodes. The sites that are ready first win the power. ## Demand and access Operators, developers and infrastructure funds have told us in writing where they want to buy, at what size and at what stage. Those requirements are the brief every site is screened against: we look for land where they want to buy, not land that happens to have power. | Who | Where | Size | What they buy | Status | Written | |---|---|---|---|---|---| | Infrastructure fund (data center platforms) | Germany Tier-2 cities, UK | 5–15 MW | Powered land, greenfield or brownfield | Shortlist under review; call being scheduled | Jul 2026 | | European operator, M&A team | London, Frankfurt, Paris | ~100 MVA ideal; smaller only inside established clusters | Brownfield | Requirement on file | Jul 2026 | | Same operator, development team | UK, France, Germany | ≥40 MVA in Tier 1–2 markets; ≥200 MVA elsewhere | Brownfield | Requirement on file | Jul 2026 | | Global operator, EMEA acquisitions | Across EMEA | “Especially large ones” | Powered sites | Open brief | Aug 2026 | Anonymised from written messages Ampervia holds; names are shared only under each site’s confidentiality terms. These are stated requirements, not commitments to buy a specific site. Also on file: a European data center capital-markets advisor offering to take powered sites to operators under NDA, two developers offering sites to our buyers, and one operator that declined (North America only for now). - **Grid-connection engineers** — Read the node, the connection rules and the route to a firm offer. - **Land and planning lawyers** — Title, options, zoning and the permit path for a data center use. - **Permitting consultants** — Environmental and building permits, and the timetable to ready-to-build. - **Surveyors** — Site constraints, access, flood and ground conditions. - **Operators, developers and funds** — The buyers whose written requirements every site is screened against. The model is established: ActivumSG in Spain secures sites and power rights and sells to developers, UNIQ LAND develops powered land and ready-to-build sites in the DACH region, and CPP Investments formed an €8 billion European partnership with Goodman built on its powered landbank, with €2.2 billion committed first to Frankfurt, Amsterdam and Paris. ## One transaction, start to finish ### What happened at Meco (published, not an Ampervia deal) - **Industrial land** (Estimate: land ≈ €1.5–3.5m) — A plot in Meco, near Madrid. Comparable industrial land around it was worth roughly €1.5–3.5m. - **Power is secured, the site sells** (Sale: €11m) — With a 25 MW power agreement and a dual feed, the owner sold the site to a data center operator for €11m. - **The operator builds** (Build: €400m) — The operator approved €400m to build the first phase. That is the buyer’s own construction capital, not proceeds to the seller. ### How a member takes part in an Ampervia site - **You join** (Membership) — €25,000 a year. Every week a site is reviewed live with members; you get every dossier with the site identified. - **A site comes through** (Review) — Land that fits a buyer’s written requirement, found and assessed with local specialists. - **The site is secured** (Optional co-investment) — A vehicle is formed and offered to members first. It options the land and files the grid request. You choose whether to invest in it. - **A buyer enters** (Sale or partnership) — An operator or fund buys the site or partners on it, at site control, during development or at ready-to-build. Members in that vehicle take their share, or continue if the buyer offers a stake. The Meco figures are published; the land value is an Ampervia estimate from comparable land ([Meco case](https://ampervia.com/case-studies/meco-madrid-powered-land/)). The member path describes how an Ampervia vehicle is intended to work, not a result. Sites can fail at the grid or planning stage, the costs of securing a site are real, and you can lose money. ## Where Ampervia is today - **Jul 2026: Buyer requirements in writing** — Three briefs from an infrastructure fund and a European operator: where they want to buy, at what size and at what stage. - **Aug 2026: A fourth brief** — From a global operator’s EMEA acquisitions team. - **Oct 2026: Sites screened against the briefs** — 60 candidate sites in 6 European countries checked against public records and the briefs, plus early leads in the markets the fund named. The shortlist is with the fund for review. - **Next stage: Next for each candidate** — An owner or authorised seller confirms willingness to sell, lease or partner. That moves a site from research to buyable, the stage before a buyer and a vehicle are matched to it. ## Your membership experience - **Every week: a site in review** — A live private session on one candidate site: which buyer requirement it answers, the power and planning evidence, what is unresolved, what the next step costs, and whether we advance, pause or reject it. Bring your questions. - **Monthly pipeline report** — A written summary of every site screened that month and where each one stands. - **Site dossiers** — For each site that passes screening: grid evidence, land and title, permit path, cost-to-ready-to-build items, risks and the next decision. See the [sample dossier](https://ampervia.com/club/sample-dossier/). - **Full site identities** — Members see sites identified, not redacted: what the public map shows only at zone level. - **Members offered first** — Each site vehicle is offered to members before outside investors, within a set offer window; allocation and minimums are set in that vehicle’s documents. - **Country rule notes** — Each market we work in: grid-connection and permitting changes as they happen, with what they mean for sites. - **Rejected sites, explained** — Every site we drop and why: the screening discipline you are paying for, not only the winners. | On your own | Through the Club | |---|---| | Find owners and opportunities yourself | Access sites as Ampervia sources them | | Learn unfamiliar sites, grids and rules | Review organised evidence and specialist assessments | | Build buyer relationships from scratch | Evaluate sites against documented buyer requirements | | Coordinate engineers, lawyers and surveyors | Follow a coordinated process, with specialists engaged per site | | See only what is pitched to you | See why candidates advance, pause or fail | - **Week 1** — Onboarding call with Razvan, access to every existing note, dataset and dossier, and your first weekly site review. - **Month 1** — Four weekly reviews and the first monthly pipeline report. - **Months 2–3** — A site reviewed every week: advanced, paused or rejected, and the buyer requirement behind each. - **Ongoing** — A dossier for each site that passes screening, and each site vehicle offered to members first as it forms. ## How the money works - **Membership gives you access** — Off-market site opportunities as we assemble them, the dossiers and weekly site reviews behind each one, and the network: local specialists in each market, engaged per site and the operators and funds that buy ready sites. - **Project capital secures the site** — When a site is worth securing, a separate vehicle (SPV) is formed for it and takes it as far as the partner needs, usually the land option and the grid request. Members who want to invest put capital into that vehicle. Everything is optional. - **Institutions can enter before ready-to-build** — An infrastructure fund, operator or developer can come in once the site meets its requirements, through a joint venture, staged funding or a conditional purchase, and carry it forward to ready-to-build and the build. Members in that vehicle take their share or continue. | What membership gives you | What depends on a separate site vehicle | |---|---| | Research and screening intelligence | An executable site opportunity | | A live site review every week | Site control and confirmed power arrangements | | Dossiers, full site identities and specialist Q&A | The vehicle’s investment terms and minimum | | Visibility into progress and rejected candidates | Institutional participation or an exit | ## Membership at a glance - **€25,000 per year**, 12 months, renewable - By application, for investors with **€1 million+** investable capital or access to it - Co-investing is optional; each vehicle has its own documents, minimum and costs - Research free to use; dossier sites protected for 24 months - Full membership terms: https://ampervia.com/terms/#club ## Questions ### What do I receive if no site becomes investable this year? Everything in the work programme: a live site review every week, a dossier on every site that passes screening, full site identities, rejected sites explained and country rule notes. These are commitments. Whether a site reaches option depends on owners, grid operators and buyers, which no one controls. ### What evidence is there of institutional demand? Operators, developers and infrastructure funds have given us their site requirements in writing, and published deals show buyers paying for land with power before construction (see the [case studies](https://ampervia.com/case-studies/)). Members see which requirement each site answers. A stated requirement is not a commitment to buy a specific site. ### What are my participation rights? Each site vehicle is offered to members before outside investors, within its offer window. Allocation, minimums, fees and your rights (information, approvals, exit) are set in that vehicle’s documents, shared before you decide. ### Is membership an investment? No. It is a paid research and origination service. Investing happens only through a site vehicle, offered privately to eligible members under its own documents. ### Do I have to invest in every site? No. Every site vehicle is optional. ### How does Ampervia earn money? From memberships and, on each vehicle, a sponsor fee or profit share set in that vehicle’s documents. ### Can I buy a dossier site directly from the owner? Not within 24 months of it being shared, unless through an Ampervia vehicle or with Ampervia’s written consent and an agreed introduction fee. Relationships you can document before the introduction, and publicly listed sites, are excepted. This protects the origination every member pays for. ### Where are the full membership terms? In the [Terms of Use, section 3a](https://ampervia.com/terms/#club): fee, term, refunds, use of research, protected dossier sites and confidentiality. Full thesis and all questions: https://ampervia.com/club/thesis/ **Important.** This website is for information only. It is not an offer to sell or a solicitation to buy any security or interest in any fund or vehicle, and nothing on it is investment advice. Club membership is a paid information and research service and is not itself an investment. Any participation in a site vehicle is offered privately, only to eligible investors, under that vehicle’s own documents. Sites shown are research inventory, not secured projects. Investing in early-stage real estate and infrastructure carries a risk of loss.